West Midlands clay after a week of rain does not care about your programme. Pegs move, sight lines fill with mist, and a hurried set-up will give you a tidy-looking traverse that is simply wrong.

Begin with control. Confirm two known points, check the instrument height twice, and write the temperature if your total station expects it. A five-minute ritual here saves an hour of arguing with the concrete gang later.

When the ground is soft, use longer stakes and protect the point with a clear guard. Do not rely on a single nail in saturated timber. If a control point looks disturbed, resurvey before you set out a wall line.

Short winter days force prioritisation. Set the critical grids and finished floor datum first; decorative setting-out can wait for clearer light. Our workshop learners practise this triage on the campus yard before they join a partner site.

Knowing when to stop is part of the craft. If residuals keep growing, pack the instrument, protect the points, and return. A clean morning shot is worth more than a muddy evening guess.